Case Study: Pipeline Scheduling Program Recovery

Pipeline in the countryside

Case Study: Using Project Management to Recover a Pipeline Scheduling Program Share on linkedin Share on twitter Share on facebook Back to top Our client, an Oil and Gas major, was a year into a pipeline scheduling digital transformation project that was not on track to meet its original deadline. Pipeline scheduling refers to the […]

Case Study: Programme Recovery for a Nuclear client

Nuclear plant sunset

Programme Recovery for a Nuclear client Share on linkedin Share on twitter Share on facebook Back to top A global leader in the nuclear industry initially engaged MP to support them with recovering their flagship delivery programme for the Fukushima Daiichi decommissioning. The client was growing in size but struggling to manage costs. Additionally, existing […]

Case Study: Automotive PMO for Improved Connectivity

Connected Vehicle Driver

Case Study: Automotive PMO for Improved Connectivity New digital technologies are emerging in the automotive industry, especially the demand for connected devices in vehicles. Our client, along with every other global automotive manufacturer, is developing new technology to connect devices, such as smartphones, laptops, and tablets, directly to the vehicle. Bringing tools together for connected […]

When PMO goes Viral: Crisis Management Applied to A&E in Mulhouse

GHR-MSA

Case study: When PMO goes Viral – Crisis Management Applied to A&E in Mulhouse Share on linkedin Share on twitter Share on facebook Back to top Starting in March 2020, MIGSO-PCUBED were honoured to begin engaging with the Accident & Emergency (A&E) team at the GHR-MSA (Groupe Hospitalier de la région de Mulhouse Sud-Alsace) to provide […]

Case Study: Advanced PMO Setup

Photo by Austin Distel on Unsplash

Case Study: Advanced PMO Setup MIGSO-PCUBED was brought in to help a Global Automotive Manufacturer set up a Program Management Office supporting enhanced consistency, transparency and predictability for their feature development teams as they drove a critical new feature to market. The Background MIGSO-PCUBED, a long time partner for the client providing project management consulting […]

Case Study: Development of Automated Cross Program Dashboards

Person using laptop

Case Study: Development of Automated Cross Program Dashboards Share on linkedin Share on twitter Share on facebook Back to top Our client, a leading Automotive OEM, faced with a large portal of product deliveries with multiple planning timelines, was looking for a way to centralize program level information.  This would allow the client the ability […]

MIGSO-PCUBED UK @ 25: Case Study Retrospective on London 2012 Olympics

Olympic Park Aerial London

MIGSO-PCUBED UK @ 25: Case Study Retrospective on London 2012 Olympics Share on linkedin Share on twitter Share on facebook Back to top This article is part of a series of retrospectives looking back at MIGSO | PCUBED’s 25 years of operations in the UK. We caught up with Mark Sorrell, Nickolle Paschal and Monica […]

Case Study: Schedule Development – 5 Steps to Success

Woman and Post It

Case Study: Schedule Development – 5 Steps to Success Share on linkedin Share on twitter Share on facebook Back to top The railway industry has been growing over the past few years.  With increasing investments in new rail lines supporting increased tourism and manufacturing, along with upgrades to existing lines supporting enhanced mobility, the future […]

Case Study: Making the Switch in Aerospace

Watching throught a phone from a plane

Case Study: Making the Switch in Aerospace Share on linkedin Share on twitter Share on facebook Back to top Production lead times for aircraft are at an all-time high. Manufacturers are working hard to balance both an increase in production to reduce lead times, while also ensuring that the latest innovations are available in their […]